Cemetery Road Reconstruction – Township of Uxbridge

Todd Brothers completed the Cemetery Road reconstruction project for the Township of Uxbridge, modernizing the roadway with a new underground water system, curbs, and sidewalks. The upgrade improves drainage, road durability, and pedestrian access, ensuring long-term infrastructure reliability.

The process began with removing the old road surface and outdated drainage systems. Excavation allowed for the installation of a new watermain and stormwater infrastructure, preventing flooding and increasing efficiency. Once utilities were in place, the road base was graded and compacted to support high-quality asphalt paving.

To enhance safety and accessibility, concrete curbs and sidewalks were installed, directing water flow and creating pedestrian-friendly pathways. The final stage involved asphalt paving, lane markings, and signage, delivering a durable, smooth, and modernized roadCemetery Road is now fully reconstructed, providing the Township of Uxbridge with long-lasting, high-performance infrastructure.

Facebook
Twitter
LinkedIn

More Projects

Client: Husson Engineering and Management
Project Type: Site Grading
Project Cost: $930,000
Completion Date: December 2024

Client: Sorbara Group / Fieldgate Homes
Project Type: Earthworks
Project Cost: $10,100,000
Completion Date: May 2024

Client: Tri Innovations Consulting LTD
Project Type: Site Servicing
Project Cost: $24,000,000
Completion Date: May 2024