Todd Brothers completed the Cemetery Road reconstruction project for the Township of Uxbridge, modernizing the roadway with a new underground water system, curbs, and sidewalks. The upgrade improves drainage, road durability, and pedestrian access, ensuring long-term infrastructure reliability.

The process began with removing the old road surface and outdated drainage systems. Excavation allowed for the installation of a new watermain and stormwater infrastructure, preventing flooding and increasing efficiency. Once utilities were in place, the road base was graded and compacted to support high-quality asphalt paving.
To enhance safety and accessibility, concrete curbs and sidewalks were installed, directing water flow and creating pedestrian-friendly pathways. The final stage involved asphalt paving, lane markings, and signage, delivering a durable, smooth, and modernized road. Cemetery Road is now fully reconstructed, providing the Township of Uxbridge with long-lasting, high-performance infrastructure.