This project was built to MTO road specifications. It included a precast box culvert, a decorative concrete panel retaining wall, contaminated soil removal and extensive sub drain installation through the steep banks to stabilize the high groundwater level. It also involved installing a road sign that spanned the off-ramp from Highway 400 to Essa Road, which involved an overnight ramp closure.
Location
Barrie, Ontario
Owner
Ivanhoe Cambridge
Consultant
MMM Group
Category
Road Construction