Simcoe Access Road

This project was built to MTO road specifications. It included a precast box culvert, a decorative concrete panel retaining wall, contaminated soil removal.

This project was built to MTO road specifications.  It included a precast box culvert, a decorative concrete panel retaining wall, contaminated soil removal and extensive sub drain installation through the steep banks to stabilize the high groundwater level.  It also involved installing a road sign that spanned the off-ramp from Highway 400 to Essa Road, which involved an overnight ramp closure.

Location

Barrie, Ontario

Owner

Ivanhoe Cambridge

Consultant

MMM Group

Category

Road Construction

 