Recycling Rocks

Earthworks recycled material

Sometimes we are able to provide services which include re-using unwanted materials from one project and placing them in new location which can help improve the site.

Baker Hill Bridge

Todd Brothers was retained in the Construction of the Baker Hill Bridge. Scope of construction included directional drill installation of water-main under the creek, storm sewer construction, landscaping, bridge and road construction.

Location

Stouffville

Value

$3,700,000

Consultant

SCS Consulting Group

Owner

Stouffcon Eight

Date

July 2017

Category

Bridge Construction, Road Construction, Sewer and Watermain

Highland Gate

Completed in 2017, the Highland Gate subdivision was one of our most demanding earthworks projects to date. The site was originally a  golf course and was surrounded by hundreds of existing estate lots placing emphasis on competent dust mitigation and erosion control. A temporary Haul road and bridge was built through a protected wetland to facilitate site access. Over 100`000M3 was exported in 3 months in difficult ground conditions.

Location

Aurora, ON

Value

$3,500,000

Consultant

SCS Consulting Group

Owner

Geranium

Date

August, 2017

Category

Earthwork, Road Construction

 

Sunderland Sewage Lagoon Expansion

Todd brothers was awarded the contract for a lagoon expansion for the region Of Durham.  This project involved the installation of :  forcemains, valve chambers, Geotextile Liner system and Sand protection layer.

Location

Sunderland, ON

Value

$2,400,000

Consultant

WSP

Owner

Region of Durham

Date

July 2016

Category

Sewer and Watermain

 

Queens Landing Subdivision

Todd Brothers completed the Earthworks program for the Queens landing subdivision in 2016. This project involved the excavation of a 120`000m3, 7m deep storm pond. Most of the fill had to cross a York Region road, traffic control and road cleaning allowed the 12 rock trucks required to pass between sites on the 2km haul route.

Location

East Gwillimbury, ON

Value

$2,400,000

Consultant

Schaeffers Consulting Group

Owner

Minto

Date

September 2016

Category

Earthwork

 

Bloomington Estates

Todd Brothers was contracted to complete the earthworks and servicing of a 28 lot estate subdivision. This project was completed on time and on budget.

Owner

Logan Homes

Consultant

SCS Consulting Group

Value

$3,100,000

Location

Stouffville, ON

Date

August 01, 2016

Category

Earthwork, Road Construction, Sewer and Watermain

 

Curb Pouring

Putting down curbs

Spring time activities are in full swing.  One of the projects this week is putting down curbs in a newly completed residential neighbourhood build by Logan Homes.

Green Gables Subdivision

Green Gables Subdivision

Todd Brothers Completed site servicing for a 28 lot estate subdivision in Goodwood. Two box culverts were installed in environmentally sensitive areas in addition to construction of 1.8km of road.

Owner

Oxford Developments

Value

$2,800,000

Location

Goodwood

Date

May 2015

Category

Earthwork, Road Construction, Sewer and Watermain

 

Peterborough Landfill Cell 3 Excavation

Peterborough Landfill Cell 3 Excavation

Todd Brothers assisted in the excavation of 280,000m3 in order to construct a new cell at the Peterborough Landfill . Having the right equipment for the job kept us on schedule despite difficult ground conditions.

Location

Peterborough

Owner

City of Peterborough

General Contractor

Drain Bros LTD

Value

$850,000

Consultant

UEM

Date

April 2015

Category

Earthwork

 

Christmas cheer … Todd style!

Rock Truck Hot Tub

It was a majestic day in Stouffville Ontario when a couple of young innovators had a idea. To turn a rock truck into a hot tub. A mobile hot tub in the back of a rock truck for the Santa Claus Parade.

Continue reading